Material Type:Solid | Packaging:Bags |
Packaging Material:Composite Materials | Type Machine:Rotary Type with 8 Working Station for 60bags/Min |
Machine Name:Automatic Weighing and Packaging Machine | Bag Size Range:Width 70-220mm, Length 80-350mm |
Main Electrical Components:Siemens PLC/Siemens HMI/Omron/Schneider | Main Pneumatic Components:SMC Solenoids & Cylinders |
The Methods for Adjust Bag Width:PLC Automatic Adjust Bag Width | Cam Design:Internal Grooved Cam Design |
Bag Cabinet Type:Horizontal Infeed Belt | The Methods for Lubrication:Automatic Lubrication System |
The Methods for Guarding:Automatic Detection/Glass Door Alarm | Trademark:Honetop |
Transport Package:Standard Exporting Packing (Whole Wooden Case) | Specification:CE |
Origin:China | HS Code:8428399000 |
Product Description
Machine adopt PLC control system and air cylinder for operation, make sure each parts can be working independent and easy for maintain and cleaning.Nitrogen gas inflation, batch number printing, handing hole making, etc function was available. Bag type like: pillow bag, 4 sides bag seeal, gusset bag, quad bag was no problem for this model.Suitable products like: candy, seeds, jelly, pet foods, puffy foods, pistachio, peanuts, nuts, raisins etc. and big shell nuts, hardwares, dried fruits, frozen foods, snack foods, meatballs and so on.,etc.The Packing weight tolerance only ± 1%.If working with other filling system like: dosing cup, liquid pump, chain buckets, auger filler etc can be using to pack grain, liquid, powder products.
FAQ
1Q: Are you a trade company or a manufacturer?
A: we are a manufacturer, welcome to visit our factory and check the machines.
2Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, we could discuss before contract.
3Q: Could you supply all the parameters about the machines?
A: Yes, we will supply all the parameters, price, layout drawing, factory design etc.
4Q: What is your terms of payment ?
A: 30% T/T in advance , 70% balance before shippment after inspection.
5Q: How about the after-service?
A: We will send 1 engineer to the buyer's factory for 7-14 days period installation and training to the operators.
Copyright © 2017 - 2021Spaghetti Straws Making Machine Manufacture All Rights Reserved